Skip to content
Wattsmith Electric

Panel Upgrades | Kendall County

Panel Upgrades in Boerne, TX

100 amp to 200 amp is our specialty. Permitted, inspected, and built to code. Serving Boerne and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

When you need panel upgrades in Boerne, you want it done once and done right. Straight pricing, clean work, and a warranty that means something.

Boerne is ranch country. Long service runs, well and septic pumps, gates, barns, and shops. We plan power across the whole property, set sub-panels where they belong, and back it all with generator options for when the grid drops.

Every panel upgrades job in Boerne gets the Wattsmith Standard: on time, flat rate before work starts, a clean job site, and code-right work or we make it right.

What panel upgrades in Boerne includes

  • 100 amp to 200 amp service upgrades
  • Panel and meter combo replacements
  • Federal Pacific and Zinsco panel replacement
  • Sub-panel installation for shops, additions, and pools
  • Whole-home surge protection added at the panel
  • Permit, utility coordination, and inspection handled

Straight pricing

Panel upgrades are quoted flat after we see the panel, the meter, and the service. The number you approve is the number you pay.

FAQ

Panel Upgrades in Boerne, answered

Straight answers. If you do not see yours, call us and ask.

If you are adding an EV charger, electric heat, or a large addition, almost always yes. We size the service to your real loads plus room to grow, not a guess.

Panel Upgrades in Boerne, quoted flat

Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote