Skip to content
Wattsmith Electric

EV Charger Installation | Kendall County

EV Charger Installation in Boerne, TX

Level 2 charging done right, sized to your panel and your car. Serving Boerne and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Boerne homeowners call Wattsmith Electric for ev charger installation. We find what others miss, price it flat, and do the work right the first time. Veteran-owned and dependable.

Boerne is ranch country. Long service runs, well and septic pumps, gates, barns, and shops. We plan power across the whole property, set sub-panels where they belong, and back it all with generator options for when the grid drops.

You get one flat number for your Boerne project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.

What ev charger installation in Boerne includes

  • Level 2 240 volt charger installation, plug-in or hardwired
  • Dedicated circuit sized to the charger and the car
  • Load calculation to confirm panel capacity
  • Panel or sub-panel upgrade when capacity is short
  • Clean conduit runs across the garage or exterior
  • Permit and inspection where required

Straight pricing

Most installs are quoted flat once we know the panel location, the charger, and the run. Long runs and panel work are priced up front, never after.

FAQ

EV Charger Installation in Boerne, answered

Straight answers. If you do not see yours, call us and ask.

A properly sized Level 2 circuit adds roughly 25 to 40 miles of range per hour depending on your car and charger. That is overnight full from empty for most drivers.

EV Charger Installation in Boerne, quoted flat

Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote