Skip to content
Wattsmith Electric

Lighting Installation | Kendall County

Lighting Installation in Boerne, TX

Recessed cans, ceiling fans, and landscape lighting placed with intent. Serving Boerne and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Wattsmith Electric handles lighting installation in Boerne with no guessing and no surprise invoices. Honest flat-rate work from a veteran-run crew that shows up squared away.

Boerne is ranch country. Long service runs, well and septic pumps, gates, barns, and shops. We plan power across the whole property, set sub-panels where they belong, and back it all with generator options for when the grid drops.

We serve Boerne out of San Antonio with the same crew and the same flat-rate honesty we bring to every community in the metro. Your quote is your price.

What lighting installation in Boerne includes

  • Recessed can and canless LED layout and installation
  • Ceiling fan installation and fan-rated box replacement
  • Landscape and pathway lighting with transformers and timers
  • Under-cabinet, cove, and accent lighting
  • Dimmer and smart switch installation
  • Fixture swaps, chandeliers, and high-ceiling work

Straight pricing

Lighting is quoted flat by scope. We count the fixtures, the switching, and the access, then give you one price.

FAQ

Lighting Installation in Boerne, answered

Straight answers. If you do not see yours, call us and ask.

Yes. We install low-voltage landscape and pathway lighting with the right transformer, timers or photocells, and buried runs that stay hidden and hold up.

Lighting Installation in Boerne, quoted flat

Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote