Skip to content
Wattsmith Electric

Surge Protection | Kendall County

Surge Protection in Boerne, TX

Stop the spikes at the panel before they reach your electronics. Serving Boerne and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

When you need surge protection in Boerne, you want it done once and done right. Straight pricing, clean work, and a warranty that means something.

Boerne is ranch country. Long service runs, well and septic pumps, gates, barns, and shops. We plan power across the whole property, set sub-panels where they belong, and back it all with generator options for when the grid drops.

Every surge protection job in Boerne gets the Wattsmith Standard: on time, flat rate before work starts, a clean job site, and code-right work or we make it right.

What surge protection in Boerne includes

  • Type 2 whole-home surge protective device at the panel
  • Point-of-use protection for sensitive equipment
  • Proper grounding and bonding verification
  • Coordination with a panel upgrade when needed
  • Status indicator so you know it is still protecting

Straight pricing

Surge protection is a flat-rate install. Bundle it with a panel upgrade and it goes in while the panel is open.

FAQ

Surge Protection in Boerne, answered

Straight answers. If you do not see yours, call us and ask.

It depends on how many hits it takes. Quality units have an indicator light. When it changes, you replace the module, not the whole unit. We show you what to watch for.

Surge Protection in Boerne, quoted flat

Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote