Skip to content
Wattsmith Electric

Service

Whole-Home Surge Protection in San Antonio

Stop the spikes at the panel before they reach your electronics.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

$49 Off Your First Service Call

New customers take $49 off their first diagnostic or service call with Wattsmith Electric.

New residential customers only. One per household. Valid on your first service call only. Not combinable with other offers. No cash value. Mention this offer when you book.

Surge Protection in San Antonio, the quick facts

  • Whole-Home Surge Protection in San Antonio, TX from Wattsmith Electric, a licensed, insured, veteran-owned electrical contractor.
  • Panel-mounted surge protection that guards the whole home from voltage spikes.
  • Pricing is flat-rate, quoted and approved before any work starts, with no hourly meter.
  • Licensing status: Texas electrical contractor, TECL 41806.
  • Call (210) 446-5446 for surge protection in San Antonio.

Why it does not pay to wait

A single surge from a storm or a grid event can take out everything hardwired at once: the HVAC control board, the oven, the well pump, a smart panel. A plug strip protects none of that. The gear you lose in one event costs far more than the protection would have.

Power strips protect one device. They do nothing for your HVAC, your oven board, your garage door, or the LED drivers in your ceiling. A single surge from a storm or a utility switch can take out thousands of dollars of electronics in an instant.

We install a whole-home surge protective device at the panel. It clamps the spike before it spreads through the house. It is a small install with a large payoff, and it pairs perfectly with a panel upgrade.

What we handle

  • Type 2 whole-home surge protective device at the panel
  • Point-of-use protection for sensitive equipment
  • Proper grounding and bonding verification
  • Coordination with a panel upgrade when needed
  • Status indicator so you know it is still protecting

What you can check yourself first

Before you call, here is what you can safely check on your own. Even if you still call us, you will walk in knowing more than you did.

  • List the expensive hardwired gear: HVAC boards, oven, well pump, smart home panel.
  • Check whether you already have any surge device at the panel.
  • Note if you are on a line that flickers or browns out during storms.
  • Keep power strips for the electronics, and ask us about the panel-level device that protects the rest.

Straight pricing

Surge protection is a flat-rate install. Bundle it with a panel upgrade and it goes in while the panel is open.

  • Three options on every job, priced flat. You choose the scope.
  • The diagnostic fee applies toward the work performed.
  • The price you approve is the price you pay.

How our pricing works

Protect your home's electronics

Flat-rate quote before any work starts. A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

Surge Protection questions

Straight answers. If you do not see yours, call us and ask.

Yes. A panel-mounted device clamps high-voltage spikes before they travel through your circuits. It protects the hardwired equipment a power strip never touches, like your HVAC and appliances.

Need surge protection done right?

Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote