Skip to content
Wattsmith Electric
A neatly wired electrical breaker panel with color-coded conductors

Service

Home Generator Installation, Service and Repair in San Antonio

Standby and portable hookups wired safe, with a transfer switch done right.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Same day

Appointments available

Flat rate

Approved before work begins

TECL 41806

Licensed and insured

8am to 8pm

Open every day

Electrical emergency? Sparks, burning smell, or a dead panel: call (210) 446-5446 now

Emergency service

$49 Off

Your First Service Call

New customers take $49 off their first diagnostic or service call with Wattsmith Electric.

New residential customers only. One per household. Valid on your first service call only. Not combinable with other offers. No cash value. Mention this offer when you book.

Our service guarantees

  • We hit your window. Miss it with no heads-up, and that is $149 off.
  • You approve one flat price before we touch a wire. No hourly meter.
  • We protect your floors, haul our mess, and leave the space clean.
  • Everything meets code and we stand behind it, or we come back and fix it.

The On-Time Promise fine print, in full

Wattsmith Electric works to the 2023 National Electrical Code and pulls the permit where one is required. How we handle permits, inspections and the workmanship guarantee is on our standards page. The license, the coverage in force and our federal registrations, including the certificate of insurance process for contractors, are on insurance and licensing.

Why it does not pay to wait

When the grid drops in a Texas storm or freeze, an unprepared home loses heat, refrigeration, medical equipment, and the well pump if you have one. An improper generator hookup is worse: it can backfeed the line and electrocute a lineman. Waiting risks both comfort and a life.

Texas taught everyone a lesson about the grid. When the power drops, you want to flip to backup without dragging cords through a window or backfeeding a line and putting a lineman at risk. That is what a proper transfer switch is for.

We install standby generators on a pad with an automatic transfer switch, or we set up a portable-ready interlock so you can run the essentials safely. Either way it is permitted, code-right, and wired so nobody gets hurt.

What home generator installation includes

  • Standby generator installation with automatic transfer switch
  • Portable generator interlock kits and inlet boxes
  • Manual transfer switch installation
  • Dedicated circuits for critical loads
  • Gas and pad coordination with your other trades
  • Permit and inspection handled

Generator repair and standby generator service

We service and repair standby generators as well as install them. A unit that will not start, will not transfer, or drops out under load usually comes down to a short list on the electrical side: the battery or its charger, the transfer switch, the controller, or the wiring between them. We find which one, quote the repair flat, and fix it.

Home generator maintenance is what keeps a standby unit ready for the outage it was bought for. We check the battery and charger, the transfer switch, and the connections, and tell you plainly what is due and what is not.

Signs you need this

  • You lose power more than you should and you are done with it
  • You run medical equipment or a home office that cannot go dark
  • You are backfeeding a portable generator through a dryer cord
  • You want whole-home backup without the extension cords

What you can check yourself first

Before you call, here is what you can safely check on your own. Even if you still call us, you will walk in knowing more than you did.

  • Decide what has to keep running in an outage: fridge, heat, AC, well pump, medical gear.
  • Note whether you have natural gas, propane, or neither. That drives the generator type.
  • Find a spot outside, away from windows, where a unit could sit.
  • Never run a portable generator into a wall outlet. Ask us about a proper interlock or transfer switch instead.

Straight pricing

Free estimate. We come look at the panel, the load list, and the set location, and give you a fixed price before anything starts.

  • Up to three options on a job, each a real way to do it, priced flat. You choose the scope.
  • The estimate is free. Nothing is owed until you approve the work.
  • The price you approve is the price you pay.

How our pricing works

Generator Installation

Generator Installation services

Size your generator

Flat-rate quote before any work starts. A Wattsmith electrician calls you back within 15 minutes during business hours.

Generac generators

Do you install Generac home standby generators?

Yes. We sell and install Generac home standby and commercial generators. We set the unit, mount and wire the automatic transfer switch, run the wiring between the generator, the switch and your panel, and start the unit up and test it under load before we leave. The gas line is a licensed plumber's work, quoted separately.

Do I need a permit for a standby generator in San Antonio?

Inside San Antonio, the City's electrical permit application covers generators, and we pull the permit and schedule the inspection through Development Services. Texas changed how cities may regulate home backup systems in 2025, and the suburban cities run their own permit offices, so we confirm what your city requires before we write the price.

Every Generac size, the cost guide and the free sizing visit are on our Generac page.

FAQ

Generator Installation questions

Straight answers. If you do not see yours, call us and ask.

Standby runs automatically and covers the whole home, at a higher cost. Portable with an interlock covers essentials for less money and some hands-on effort. We size both to your loads and let you choose.

Need generator installation done right?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote