
Comal County
Electrician in New Braunfels, TX
Licensed electrical service for New Braunfels, quoted flat before we start.
- Licensed and Insured
- BBB Accredited
- Veteran-Owned
- Flat-Rate Pricing
- Background-Checked
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
New Braunfels sits on IH-35 between the Comal and the Guadalupe, with Loop 337 wrapping the town, Landa Park on the Comal springs, and the historic Gruene district up on the Guadalupe. It is booming, and it is old, at the same time.
That produces the widest spread of work we see anywhere: rough-in on new construction one day, a delicate panel swap in a century-old downtown home the next. The growth continues down the interstate in Cibolo and Schertz, and the river conditions carry upstream to Canyon Lake.
The ground we cover
New Braunfels, corridor by corridor
- IH-35
- SH 46
- Loop 337
- the Comal River
- the Guadalupe River
- Gruene
- Landa Park
- Two rivers means real GFCI discipline
- The Comal and the Guadalupe are the reason the town exists and the reason exterior protection matters. Anything near water, in a garage, or below grade gets the protection code calls for.
- Historic downtown rewires
- Homes near the old center are the better part of a century old. A rewire there is a careful job through plaster, not a production run. We plan the routes before we cut.
- New Braunfels has its own utility
- The city is served by its own municipal utility rather than the San Antonio one, and that changes the service application and the timeline. We sort that out up front so the date we give you is a date that holds.
Electrical services in New Braunfels
The full range of Wattsmith work, available across New Braunfels. Click any service for the details.
- Electrical Repair
- Panel Upgrades
- EV Charger Installation
- Whole Home Rewiring
- Lighting Installation
- Generator Installation
- Surge Protection
- Outlets and GFCI
- Smoke and CO Detectors
- Electrical Inspections
- Commercial Electrical
- New Construction Wiring
Local and ready
Whatever your New Braunfels home or business needs, we quote it flat and do it right. Call today.
The Wattsmith Standard
How we do the work
Four things we do on every job, and what happens when we miss one.
The Wattsmith On-Time Promise
We show up in the window we give you. If something moves it, you hear it from us first, with a reason. Miss the window with no heads-up, and your diagnostic fee is on us.
Flat rate before work starts
You get the price up front and you approve it before we touch a wire. No hourly meter running while you watch.
Clean job site
We protect your floors, haul our mess, and leave the space the way we found it. You should not be able to tell we were there, except the work is done right.
Code-right, or we make it right
Everything we install meets code and we stand behind it. If it is not right, we come back and fix it. That is the whole deal.
FAQ
New Braunfels electrical questions
Straight answers. If you do not see yours, call us and ask.
Yes. We are a licensed and insured Texas electrical contractor and we pull the proper permits for work in New Braunfels wherever code requires it.
Need an electrician in New Braunfels?
Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Veteran-Owned
- Flat-Rate Pricing
- Background-Checked
Nearby areas