Skip to content
Wattsmith Electric

Service

New Construction Wiring in San Antonio

Rough-in to trim, wired to a plan and built for how you actually live.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

$49 Off Your First Service Call

New customers take $49 off their first diagnostic or service call with Wattsmith Electric.

New residential customers only. One per household. Valid on your first service call only. Not combinable with other offers. No cash value. Mention this offer when you book.

New Construction Wiring in San Antonio, the quick facts

  • New Construction Wiring in San Antonio, TX from Wattsmith Electric, a licensed, insured, veteran-owned electrical contractor.
  • Full electrical for custom homes and additions, from rough-in through trim.
  • Pricing is flat-rate, quoted and approved before any work starts, with no hourly meter.
  • Licensing status: Texas electrical contractor, TECL 41806.
  • Call (210) 446-5446 for new construction wiring in San Antonio.

Why it does not pay to wait

Wiring cut rate during construction is buried behind drywall for the life of the home. Undersized service, missing circuits, and sloppy rough-in get expensive to fix once the walls close. The one clean shot to do it right is while it is still open.

New construction is your one clean shot to wire a home right, before the drywall closes it up. We plan the circuits around how you actually live, rough it in clean, and trim it out so every switch, can, and outlet lands where it should.

Custom homes, additions, garages, and ADUs. We work off the plans, coordinate with your builder, and keep the electrical on the critical path instead of holding it up.

What we handle

  • Full rough-in for custom homes and additions
  • Service, panel, and distribution sizing
  • Recessed and layered lighting design
  • Dedicated circuits for kitchens, shops, and EV
  • Low-voltage, data, and structured wiring rough-in
  • Trim-out, device install, and final inspection

What you can check yourself first

Before you call, here is what you can safely check on your own. Even if you still call us, you will walk in knowing more than you did.

  • Walk the plan and mark where you actually live: where the TV, the desk, the shop tools, the EV go.
  • Decide the big loads early: EV, heat pump, pool, shop, so the service is sized once.
  • Note any low-voltage wants: data, cameras, structured wiring, while the walls are open.
  • Get us the plans early. Electrical on the critical path keeps the whole build moving.

Straight pricing

New construction is bid flat off the plans. Allowances and selections are spelled out so the number holds from rough-in to trim.

  • Three options on every job, priced flat. You choose the scope.
  • The diagnostic fee applies toward the work performed.
  • The price you approve is the price you pay.

How our pricing works

Get your new-construction bid

Flat-rate quote before any work starts. A Wattsmith electrician calls you back within 15 minutes during business hours.

Where we work

New Construction Wiring across the San Antonio metro

We bring new construction wiring to San Antonio and the surrounding communities. Find your area below or call and we will confirm we cover you.

FAQ

New Construction Wiring questions

Straight answers. If you do not see yours, call us and ask.

Yes. We bid and build off your plans, and we flag anything that will not meet code or will cost you later while it is still cheap to change.

Need new construction wiring done right?

Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote