Skip to content
Wattsmith Electric

Services

Electrical Services in San Antonio

Every job quoted flat before we start. Residential and commercial, from a single outlet to a whole-home rewire.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Pick the work you need

Every service below is done to code and backed by the Wattsmith Standard. Click any one to see exactly how we handle it, what it includes, and the questions we hear most.

How it works

Four steps, from your call to the warranty

  1. 1

    You call

    A real electrician picks up, not a call center. We ask what the panel, the outlet, or the lights are doing, tell you if it sounds urgent, and set a real arrival window instead of a vague all-day block.

  2. 2

    We diagnose

    We show up in the window, find the actual fault instead of guessing, and walk you to the panel or the outlet so you see what we see. A diagnostic fee applies on repairs and credits back into the work.

  3. 3

    You get one price

    Before we touch a wire, you get one flat number for the whole job and you approve it. If we open something up and find more, we stop and price it first. The bill never passes the number you agreed to.

  4. 4

    We finish and stand behind it

    We do the work to code, label the circuits, protect your floors, and haul our mess. Then we walk you through what changed, hand you the paperwork, and back it. If it is not right, we come back.

Not sure which service you need?

Tell us what is happening and we will point you to the right fix, then quote it flat. No pressure, no guessing.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote