Skip to content
Wattsmith ElectricWattsmithElectric

Kendall County

Electrician in Boerne, TX

Craftsman electrical service for Boerne, quoted flat and forged right.

  • Licensed and Insured
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

When something electrical goes sideways in Boerne, you want a craftsman, not a guesser. Wattsmith Electric brings flat-rate pricing and veteran discipline to every job in Boerne.

Boerne is ranch country. Long service runs, well and septic pumps, gates, barns, and shops. We plan power across the whole property, set sub-panels where they belong, and back it all with generator options for when the grid drops.

Electrical services in Boerne

The full range of Wattsmith work, available across Boerne. Click any service for the details.

Local and ready

Ready to get it handled in Boerne? Call us and we will give you a straight, flat-rate quote.

The Wattsmith Standard

How we do the work

Four promises we make on every job. Not a marketing line. The way a veteran-run crew operates.

The On-Time Forge Promise

We show up in the window we give you. If something moves it, you hear it from us first, with a reason. Miss the window with no heads-up, and your diagnostic fee is on us.

Flat rate before work starts

You get the price up front and you approve it before we touch a wire. No hourly meter running while you watch.

Clean job site

We protect your floors, haul our mess, and leave the space the way we found it. You should not be able to tell we were there, except the work is done right.

Code-right, or we make it right

Everything we install meets code and we stand behind it. If it is not right, we come back and fix it. That is the whole deal.

FAQ

Boerne electrical questions

Straight answers. If you do not see yours, call us and ask.

We keep room for urgent calls in Boerne. If you have a burning smell, a dead panel, or a real safety issue, call us and we will get to you as fast as we safely can.

Need an electrician in Boerne?

Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith will call you within 15 minutes during business hours.

Call NowGet a Quote