Skip to content
Wattsmith Electric

Whole Home Rewiring | Kendall County

Whole Home Rewiring in Boerne, TX

Old wiring pulled out, new wiring run to code, your home made safe. Serving Boerne and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Boerne homeowners call Wattsmith Electric for whole home rewiring. We find what others miss, price it flat, and do the work right the first time. Veteran-owned and dependable.

Boerne is ranch country. Long service runs, well and septic pumps, gates, barns, and shops. We plan power across the whole property, set sub-panels where they belong, and back it all with generator options for when the grid drops.

You get one flat number for your Boerne project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.

What whole home rewiring in Boerne includes

  • Full and partial rewires for older homes
  • Knob and tube and cloth wiring removal
  • Aluminum branch circuit replacement or remediation
  • Grounding and bonding brought to current code
  • New receptacles, switches, and GFCI or AFCI protection
  • Panel replacement coordinated with the rewire

Straight pricing

Rewires are quoted flat after a walkthrough. Scope, access, and finishes all matter, so we look first, then give you one honest number.

FAQ

Whole Home Rewiring in Boerne, answered

Straight answers. If you do not see yours, call us and ask.

Often, yes. Many insurers will not write or renew a policy on knob and tube or aluminum wiring. A documented, permitted rewire clears that flag and we provide the paperwork.

Whole Home Rewiring in Boerne, quoted flat

Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote