Skip to content
Wattsmith Electric

Whole Home Rewiring | Bexar County

Whole Home Rewiring in Universal City, TX

Old wiring pulled out, new wiring run to code, your home made safe. Serving Universal City and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Universal City homeowners call Wattsmith Electric for whole home rewiring. We find what others miss, price it flat, and do the work right the first time. Veteran-owned and dependable.

Universal City runs on Randolph, and that means a lot of veterans and active duty families. That is our crowd. On time, straight pricing, clean work. Panel upgrades, EV chargers, and repairs done the way you would expect from another veteran.

You get one flat number for your Universal City project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.

What whole home rewiring in Universal City includes

  • Full and partial rewires for older homes
  • Knob and tube and cloth wiring removal
  • Aluminum branch circuit replacement or remediation
  • Grounding and bonding brought to current code
  • New receptacles, switches, and GFCI or AFCI protection
  • Panel replacement coordinated with the rewire

Straight pricing

Rewires are quoted flat after a walkthrough. Scope, access, and finishes all matter, so we look first, then give you one honest number.

FAQ

Whole Home Rewiring in Universal City, answered

Straight answers. If you do not see yours, call us and ask.

No. We fish new wire through existing cavities wherever we can and open drywall only where access demands it. We tell you up front where patching will be needed so there are no surprises.

Whole Home Rewiring in Universal City, quoted flat

Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote