Panel Upgrades | Comal County
Panel Upgrades in New Braunfels, TX
100 amp to 200 amp is our specialty. Permitted, inspected, and built to code. Serving New Braunfels and the San Antonio metro.
- Licensed and Insured
- Veteran-Owned
- Flat-Rate Pricing
- Background-Checked
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
When you need panel upgrades in New Braunfels, you want it done once and done right. That is our whole approach. Straight pricing, clean work, and a warranty that means something.
New Braunfels is booming, and it shows in the work. New construction and additions on one side, historic downtown homes needing careful rewires on the other. We handle both, from rough-in to a delicate old-house panel swap.
From the first call to the final walkthrough, your panel upgrades in New Braunfels is handled by licensed, insured, background-checked techs who treat your home like their own.
What panel upgrades in New Braunfels includes
- 100 amp to 200 amp service upgrades
- Panel and meter combo replacements
- Federal Pacific and Zinsco panel replacement
- Sub-panel installation for shops, additions, and pools
- Whole-home surge protection added at the panel
- Permit, utility coordination, and inspection handled
Straight pricing
Panel upgrades are quoted flat after we see the panel, the meter, and the service. The number you approve is the number you pay.
Nearby
Panel Upgrades in other areas
More in New Braunfels
Other services in New Braunfels
FAQ
Panel Upgrades in New Braunfels, answered
Straight answers. If you do not see yours, call us and ask.
If you are adding an EV charger, electric heat, or a large addition, almost always yes. We size the service to your real loads plus room to grow, not a guess.
Panel Upgrades in New Braunfels, quoted flat
Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith will call you within 15 minutes during business hours.