Skip to content
Wattsmith Electric

Panel Upgrades | Bexar County

Panel Upgrades in Alamo Heights, TX

100 amp to 200 amp is our specialty. Permitted, inspected, and built to code. Serving Alamo Heights and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

When you need panel upgrades in Alamo Heights, you want it done once and done right. Straight pricing, clean work, and a warranty that means something.

Alamo Heights is full of homes built to last, and a lot of them still run on original panels and ungrounded circuits. That charm comes with old wiring, and old wiring is where we do some of our best work. Panel upgrades, grounding, and careful rewires that respect the house.

From the first call to the final walkthrough, your panel upgrades in Alamo Heights is handled by licensed, insured, background-checked techs who treat your home like their own.

What panel upgrades in Alamo Heights includes

  • 100 amp to 200 amp service upgrades
  • Panel and meter combo replacements
  • Federal Pacific and Zinsco panel replacement
  • Sub-panel installation for shops, additions, and pools
  • Whole-home surge protection added at the panel
  • Permit, utility coordination, and inspection handled

Straight pricing

Panel upgrades are quoted flat after we see the panel, the meter, and the service. The number you approve is the number you pay.

FAQ

Panel Upgrades in Alamo Heights, answered

Straight answers. If you do not see yours, call us and ask.

Most residential upgrades are a one-day job. There is a power-off window while we swap the panel and the utility reconnects. We schedule it so you are down for the shortest time possible.

Panel Upgrades in Alamo Heights, quoted flat

Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote