Skip to content
Wattsmith Electric

Panel Upgrades | Guadalupe County

Panel Upgrades in Schertz, TX

100 amp to 200 amp is our specialty. Permitted, inspected, and built to code. Serving Schertz and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

When you need panel upgrades in Schertz, you want it done once and done right. Straight pricing, clean work, and a warranty that means something.

Schertz keeps growing, and it is a mix. New construction that needs EV and generator prep, and older homes near the base that need panels and rewires. We cover both ends of that spread with the same flat-rate honesty.

From the first call to the final walkthrough, your panel upgrades in Schertz is handled by licensed, insured, background-checked techs who treat your home like their own.

What panel upgrades in Schertz includes

  • 100 amp to 200 amp service upgrades
  • Panel and meter combo replacements
  • Federal Pacific and Zinsco panel replacement
  • Sub-panel installation for shops, additions, and pools
  • Whole-home surge protection added at the panel
  • Permit, utility coordination, and inspection handled

Straight pricing

Panel upgrades are quoted flat after we see the panel, the meter, and the service. The number you approve is the number you pay.

FAQ

Panel Upgrades in Schertz, answered

Straight answers. If you do not see yours, call us and ask.

If you are adding an EV charger, electric heat, or a large addition, almost always yes. We size the service to your real loads plus room to grow, not a guess.

Panel Upgrades in Schertz, quoted flat

Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote