Skip to content
Wattsmith Electric

Panel Upgrades | Guadalupe County

Panel Upgrades in Cibolo, TX

100 amp to 200 amp is our specialty. Permitted, inspected, and built to code. Serving Cibolo and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Wattsmith Electric handles panel upgrades in Cibolo with no guessing and no surprise invoices. Honest flat-rate work from a veteran-run crew that shows up squared away.

Cibolo filled up fast with newer family homes, and those families are adding EV chargers, hot tubs, and generators. We size the panel for it, wire it clean, and make sure the additions do not overload what the builder installed.

You get one flat number for your Cibolo project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.

What panel upgrades in Cibolo includes

  • 100 amp to 200 amp service upgrades
  • Panel and meter combo replacements
  • Federal Pacific and Zinsco panel replacement
  • Sub-panel installation for shops, additions, and pools
  • Whole-home surge protection added at the panel
  • Permit, utility coordination, and inspection handled

Straight pricing

Panel upgrades are quoted flat after we see the panel, the meter, and the service. The number you approve is the number you pay.

FAQ

Panel Upgrades in Cibolo, answered

Straight answers. If you do not see yours, call us and ask.

If you are adding an EV charger, electric heat, or a large addition, almost always yes. We size the service to your real loads plus room to grow, not a guess.

Panel Upgrades in Cibolo, quoted flat

Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote