Electrical Inspections | Comal County
Electrical Inspections in New Braunfels, TX
A clear read on what is safe, what is not, and what it takes to fix it. Serving New Braunfels and the San Antonio metro.
- Licensed and Insured
- BBB Accredited
- Veteran-Owned
- Flat-Rate Pricing
- Background-Checked
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Need electrical inspections in New Braunfels? Wattsmith Electric quotes the number before we start, then does the work to code. Flat-rate pricing, no hourly meter.
New Braunfels is booming, and it shows in the work. New construction and additions on one side, historic downtown homes needing careful rewires on the other. We handle both, from rough-in to a delicate old-house panel swap.
Every electrical inspections job in New Braunfels gets the Wattsmith Standard: on time, flat rate before work starts, a clean job site, and code-right work or we make it right.
What electrical inspections in New Braunfels includes
- Panel, breaker, and service inspection
- Grounding and bonding verification
- Outlet, GFCI, and AFCI testing
- Wiring type and condition assessment
- Buyer and seller pre-sale inspections
- Prioritized written report with photos
Straight pricing
Inspections are a flat fee with a written report. Any repairs we recommend come with their own flat quote, no pressure.
Nearby
Electrical Inspections in other areas
More in New Braunfels
Other services in New Braunfels
FAQ
Electrical Inspections in New Braunfels, answered
Straight answers. If you do not see yours, call us and ask.
The service and panel, grounding and bonding, wiring type and condition, and the devices throughout. We test GFCI and AFCI protection and document everything with photos in a written report.
Electrical Inspections in New Braunfels, quoted flat
Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Veteran-Owned
- Flat-Rate Pricing
- Background-Checked