Skip to content
Wattsmith Electric

Generator Installation | Comal County

Generator Installation in New Braunfels, TX

Standby and portable hookups wired safe, with a transfer switch done right. Serving New Braunfels and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

When you need generator installation in New Braunfels, you want it done once and done right. Straight pricing, clean work, and a warranty that means something.

New Braunfels is booming, and it shows in the work. New construction and additions on one side, historic downtown homes needing careful rewires on the other. We handle both, from rough-in to a delicate old-house panel swap.

From the first call to the final walkthrough, your generator installation in New Braunfels is handled by licensed, insured, background-checked techs who treat your home like their own.

What generator installation in New Braunfels includes

  • Standby generator installation with automatic transfer switch
  • Portable generator interlock kits and inlet boxes
  • Manual transfer switch installation
  • Dedicated circuits for critical loads
  • Gas and pad coordination with your other trades
  • Permit and inspection handled

Straight pricing

Generator work is quoted flat after we see the panel, the load list, and the set location. You approve the number before we start.

FAQ

Generator Installation in New Braunfels, answered

Straight answers. If you do not see yours, call us and ask.

Standby runs automatically and covers the whole home, at a higher cost. Portable with an interlock covers essentials for less money and some hands-on effort. We size both to your loads and let you choose.

Generator Installation in New Braunfels, quoted flat

Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote