Skip to content
Wattsmith Electric

EV Charger Installation | Comal County

EV Charger Installation in New Braunfels, TX

Level 2 charging done right, sized to your panel and your car. Serving New Braunfels and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Wattsmith Electric handles ev charger installation in New Braunfels with no guessing and no surprise invoices. Honest flat-rate work from a veteran-run crew that shows up squared away.

New Braunfels is booming, and it shows in the work. New construction and additions on one side, historic downtown homes needing careful rewires on the other. We handle both, from rough-in to a delicate old-house panel swap.

You get one flat number for your New Braunfels project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.

What ev charger installation in New Braunfels includes

  • Level 2 240 volt charger installation, plug-in or hardwired
  • Dedicated circuit sized to the charger and the car
  • Load calculation to confirm panel capacity
  • Panel or sub-panel upgrade when capacity is short
  • Clean conduit runs across the garage or exterior
  • Permit and inspection where required

Straight pricing

Most installs are quoted flat once we know the panel location, the charger, and the run. Long runs and panel work are priced up front, never after.

FAQ

EV Charger Installation in New Braunfels, answered

Straight answers. If you do not see yours, call us and ask.

Hardwired is cleaner and supports higher continuous output for most units. Plug-in is easier to swap later. We help you pick based on your car, your panel, and how fast you want to charge.

EV Charger Installation in New Braunfels, quoted flat

Flat-rate pricing quoted up front. Licensed, insured, veteran-owned. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote