Skip to content
Wattsmith Electric

Careers

Journeyman Electrician

Run clean service and project work across the metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Pay
$16.00 per hour base plus tiered commission on daily collected revenue
Type
Full time
License
Journeyman
Apply for this role

Run service calls and project work across the San Antonio metro. You diagnose clean, quote flat, and leave every job better than you found it.

You work under our Master Electrician's standards, and you take pride in code-right work you can stand behind.

What you will do

  • Diagnose and repair residential and light commercial electrical systems.
  • Install panels, circuits, fixtures, EV chargers, and more, to code.
  • Quote flat and get customer approval before the work starts.
  • Keep a clean job site and a straight story with the customer.

What you need

License required

Texas Journeyman Electrician license

  • Current Texas Journeyman Electrician license.
  • Solid diagnostic skills and clean workmanship.
  • Clean driving record.
  • Pride in the trade and respect for the customer's home.

Pay

$16.00 per hour base plus tiered commission on daily collected revenue

  • Wattsmith Performance Pay: marginal commission tiers from 12% to 24%
  • Nonexempt W-2, overtime paid on the commission-inclusive regular rate
  • Per-review bonus when a five-star review names you
  • Take-home van for truck leads

Base wage plus commission on what your jobs collect, with the tiers rising as you advance. Callbacks are reworked at base rate. The numbers and worked examples are on the Performance Pay page; every figure there is an illustration of the structure, not a promised or historical wage.

Performance Pay Calculator

Run your own day

Pick an average daily collected revenue and watch the bracket math work. Base is $16 an hour on an 8-hour day; commission is marginal, so each rate applies only to the dollars inside its band.

$800
$400$2,000
Days per week

The bracket math, line by line

Base: 8 hours at $16
$128
12% on $600 (up to $600)
$72
16% on $200 ($600 to $900)
$32
Day total
$232
Hourly equivalent (8-hour day)
$29
Weekly at 5 days
$1,160
Annualized, 5 days x 50 weeks
$58,000

Illustrative examples computed from the pay structure at the stated production levels. Not guaranteed, promised, or historical earnings.

The full structure, the objections answered straight, and the worked examples are on the Wattsmith Performance Pay page.

Benefits

  • Take-home van for lead roles
  • Paid training
  • Veteran-friendly employer

What a week looks like

  • Pick up the day's service calls and project work from dispatch.
  • Diagnose, quote flat, and do the work clean and to code.
  • Label the work, walk the customer through it, and stand behind it.

Who thrives here

  • You diagnose clean and take pride in work that passes inspection the first time.
  • You can talk straight to a customer and quote flat without games.
  • You want room to grow toward master, not a ceiling.

Do not apply if

  • You cut corners when nobody is looking. Our work gets walked.
  • You want to be handed every step. Service work needs judgment.

Tools, van, and pay

Lead roles get a take-home company van, stocked and maintained. We buy the power tools, the meters, and the material. You bring your own hand tools, the way any tradesman does.

Pay grows as you add licenses and take on more responsibility. Under Wattsmith Performance Pay, commission tiers rise as you advance through the career ladder, so the same day of work pays more at every rung. We would rather pay to keep a good electrician than train a new one.

All open roles

Ready to do the work right?

If you respect the trade and want to build something, we should talk. Become a Wattsmith.

  • Licensed and Insured
  • BBB Accredited
  • Veteran-Owned
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote